1. A new bridge was fitted some three months later during the winter. 2. Finally a new bridge was erected over the road. 3. Piling for the new bridge was completed by Christmas. 4. The new bridge has brought considerable benefits. 5. The new bridges across the Lagan slowly take shape. 6. Wide roads lead to a new bridge crossing the water and traffic can proceed at a fast pace without a halt. 7. Work on the new bridge will begin next year. 8. The new bridge was erected as a temporary measure to replace the one which was destroyed by floods. 9. Construction of the new bridge will begin in the spring. 10. The net result of the new bridge will be fewer traffic jams. |